AquaVita

Intelligent water-based agriculture

Water & Nutrient System

Closed-loop system control

Unified view of pH stability, EC balance, flow dynamics, and reservoir health.

Hydroponic Loop · LIVE

Closed-Loop Reservoir System

Click any node to inspect operational telemetry.

CIRCULATION ACTIVE
412 L/H
RESERVOIR · 847L84.7%CAPACITYPUMPFILTERN·P·KMIXERUV STERILIZERRETURN LOOPSENSOR ARRAY · 24CHPRESSURE 2.18 barFLOW 412 L/hUV 42 mJ/cm²
SELECTED · reservoir

Nutrient Reservoir Tank

Capacity847 / 1000 L
Nutrient MixLettuce-Optimal v3
Oxygenation (DO)8.2 mg/L
Water Temp20.4 °C
Operating within nominal envelope

Water Chemistry Monitoring

Precision sensor array · 2-second telemetry

PH

6.20

Target 5.8 – 6.5

Stable

EC

1.82mS/cm

Target 1.6 – 2.0

Optimal

DISSOLVED O₂

8.2mg/L

Target > 6.0

Optimal

TEMPERATURE

20.4°C

Target 18 – 22

Stable

NUTRIENT CONC.

1140ppm

Target 1050 – 1250

Stable

CONDUCTIVITY DRIFT

0.04Δ/h

Target < 0.10

Nominal

Nutrient Balance Panel

N · P · K · Ca · Mg saturation per 24h cycle

84%

N

UPTAKE

76%

P

UPTAKE

91%

K

UPTAKE

68%

Ca

UPTAKE

79%

Mg

UPTAKE

SYSTEM RECOMMENDATIONS

Nitrogen absorption slightly below expected uptake range in Layer 2.

Calcium utilization reduced during peak lighting cycle (14:00–17:00).

Minor EC drift detected in Layer 3 return circulation — auto-correction queued.

Phosphorus injection cycle nominal; next dose in 02:14:00.

Historical Stability Analytics

Rolling 24h window · 1m resolution

PH HISTORY

6.20

STABLE ZONE

NO RECOVERY EVENTS

EC FLUCTUATION

1.82 mS/cm

STABLE ZONE

NO RECOVERY EVENTS

RESERVOIR TEMP

20.4 °C

STABLE ZONE

NO RECOVERY EVENTS

NUTRIENT STABILITY

99%

STABLE ZONE

NO RECOVERY EVENTS

System Flow Status

Infrastructure node operational summary

Main Pump

STABLE
EFFICIENCY99.4%
RUNTIME12,408 h

Backup Pump

STANDBY
EFFICIENCY100%
RUNTIME1,204 h

UV Sterilizer

STABLE
EFFICIENCY94%
RUNTIME6,120 h

Filtration Unit

MONITORING
EFFICIENCY87.2%
RUNTIME4,860 h

Oxygenation System

STABLE
EFFICIENCY96.8%
RUNTIME8,340 h

Nutrient Injector

STABLE
EFFICIENCY98.1%
RUNTIME3,220 h

Predictive Maintenance

Hydroponic infrastructure failure forecasting

73%

PROB.

Filter clog probability rising

Estimated service window: 18 days. Sediment accumulation 27%.

9%

PROB.

Pump efficiency reduced by 9% over 48h

Vibration spectrum drifting from baseline. Inspection recommended.

64%

PROB.

UV sterilization cycle nearing maintenance

Lamp output at 94%; threshold 90%. Replace within 22 days.

22%

PROB.

Circulation pressure irregularity

Layer 3 return shows transient 0.18 bar dips at 03:00 cycle.

CLOSED-LOOP EFFICIENCY

97.3%

WATER REUSE

94%

RESERVOIR UPTIME

412d 06h

BACKUP READINESS

Ready

TELEMETRY SYNC

1.2s

Biological Risk Predictor

Contamination analysis

Algae Bloom Probability

Based on temperature and EC levels

20%

Low Risk

Bacterial Risk

Pathogen growth potential

5%

Low Risk